< Back to Main Site | Sign Up | Log In
 
Semeria Park
Binder Author:  BT  | Last updated: 06-06-10  | Views: 1575  | Credits  |  Comments 0  |  Copy
Log in to rate this binder
Welcome to Semeria Park
Drawing of Entry sign
Board Minutes Since Special Meeting
Historical Meeting Minutes
Current Belmont Parks
Coralin Feierbach information on Semeria Casa Bona Park
San Mateo Daily Journal article on Semeria Park
Loading Livebinder

Semeria Park


























Tab 0 -- Welcome to Semeria Park
Semeria Park
This binder is for neighbors who are interested in the progress of the park at the corner of  Semeria and Casa Bona.

Update May 12, 2010 New meeting minutes from April Parks and Rec meeting in the third tab above.

Update Feb 25, 2010  From an email From Daniel Ourtiague:

Hello All,

I know many of you have been following the progress of the Semeria Park project. As you may be aware, over the last several months a geotechnical analysis was being conducted to analyze the stability of the soil at the site. The completed report was recently received by the City of Belmont. The recommendations being made may have an impact on the final design and project cost. The Parks and Recreation Commission will be discussing the project at the March 3, 2010 Commission meeting. The meeting will begin at 7:00pm in the Council Chambers of City Hall. All are invited to attend.

You can view the agenda, staff report and attachments using the link below.

http://www.belmont.gov/subContent.asp?CatID=240000475

Please feel free to share this with your neighbors and others who may be interested in this project.

If you have any questions, don’t hesitate to ask.
 
Thanks for your support,

Daniel Ourtiague
Parks Division Manager
City of Belmont
650-595-7441
dourtiague@belmont.gov


Update Oct 19  From an email From Daniel Ourtiague:

SEMERIA PARK UPDATE:

The conceptual designs of the park have been presented to the residents, the Parks and Recreation Commission and also the Planning Commission. The overall design has been well received and some valuable recommendations have been made. The Parks and Recreation Commission is waiting for the revised version of the design which will be completed once the geotechnical report and soil analysis has been completed.

As you may be aware, this is a fill site which was filled when the neighboring homes were built in the 1960”s and the slope stability analysis must be conducted. The recommendation based on the analysis will ultimately drive the design and mitigation measures for the park design and its construction cost.

The city is currently soliciting bids from geotechnical firms for this work and the submittals are due on October 21, 2009. The selected consultant will bore and take soil samples for testing and make recommendations based on the results. This is a crucial part of the park design. The Landscape Architect will then revise the final design for presentation to the Parks & Recreation Commission. This will likely occur over the next several months and we are currently still on pace for construction to begin in the spring of 2010. The city is continuing to move this project forward as quickly as possible.

Thank you all in advance,

Daniel Ourtiague
Parks Division Manager

City of Belmont
650-595-7441

dourtiague@belmont.gov



Updated Sept 10: Meeting minutes from August meeting (tab3 subtab1) and special on-site meeting (tab 3 subtab 2)

Updated July 30: Draft of sign and plant list in (tab 2)

There was a public meeting held at the site on July 18.  See the second tab above for the options that were presented.  The neighbors were most favorable of Option A shown in the subtab of Tab 2.

Unfortunately, it looks like it will be spring before the project is started.
http://farm3.static.flickr.com/2338/2186436314_f1347e71ba.jpg
  Subtab 0 -- Staff Report on Landscape Architect
http://www.belmont.gov/Upload/Document/D240004541/4F-CC-02242009.pdf
  Subtab 1 -- Public Hearing
http://www.belmont.gov/Upload/Document/D240004464/4B-CC-01132009.pdf
  Subtab 2 -- Priority Calendar for Belmont Parks and Rec
http://www.belmont.gov/Upload/Document/D240004450/PRC01072009VIC.pdf
  Subtab 3 -- Yahoo Group Past Emails
http://groups.yahoo.com/group/neighborhoodpark/
Tab 1 -- Drawing of Entry sign
http://www.belmont.gov/Upload/Document/D240004995/Entry%20Sign.pdf
  Subtab 0 -- Plan favored by neighbors
http://www.belmont.gov/Upload/Document/D240004869/Conceptual%20Plan%20A.pdf
  Subtab 1 -- Plant List
http://www.belmont.gov/Upload/Document/D240004996/PRC08052009VAH.pdf
Tab 2 -- Board Minutes Since Special Meeting
City of Belmont Parks and Rec
Please see the subtabs above for meeting minutes relevant to the development of the park.
  Subtab 0 -- Apr 2010 P&R Meeting
http://www.belmont.gov/SubContent.asp?CatId=240002090&C_ID=240003828
  Subtab 1 -- Feb 2010 P&R Meeting
http://www.belmont.gov/SubContent.asp?CatId=240002090&C_ID=240003743
  Subtab 2 -- P&R Aug 5 2009
http://www.belmont.gov/SubContent.asp?CatId=240001916&C_ID=240003487
  Subtab 3 -- Special On-site Meeting July 18
http://www.belmont.gov/SubContent.asp?CatId=240001916&C_ID=240003463
  Subtab 4 -- P&R Apr 1, 2009 Park Tour
http://www.belmont.gov/SubContent.asp?CatId=240001916&C_ID=240003369
  Subtab 5 -- P&R Mar 4, 2009
http://www.belmont.gov/SubContent.asp?CatId=240001916&C_ID=240003281
  Subtab 6 -- City Council Meeting 2/24/09
http://belmont.gov/SubContent.asp?CatId=240001912&C_ID=240003227
  Subtab 7 -- P&R Dec 3, 2008
http://www.belmont.gov/SubContent.asp?CatId=240001916&C_ID=240003168
  Subtab 8 -- Special Joint Meeting Nov, 5 2008
http://www.belmont.gov/SubContent.asp?CatId=240001916&C_ID=240003167
  Subtab 9 -- P&R Oct 1, 2008
http://www.belmont.gov/SubContent.asp?CatId=240001788&C_ID=240003141
Tab 3 -- Historical Meeting Minutes
City of Belmont Parks and Rec
Please see the subtabs above for the priority calendar and relevant meeting minutes from the City of Belmont Parks and Recreation Department.
http://www.ci.belmont.ca.us/SubContent.asp?CatId=240001682&C_ID=240002503
  Subtab 0 -- Special On-Site Meeting
http://www.belmont.gov/SubContent.asp?CatId=240001788&C_ID=240003070
  Subtab 1 -- Sept 3, 2008
http://www.belmont.gov/SubContent.asp?CatId=240001788&C_ID=240003061
  Subtab 2 -- Priority Calendar
http://rs6.net/tn.jsp?e=001Xtzh7pw3y4C9V_v4wTJ4v-xbOLMNA7Y8_TOXjW952zgftq71o-5kBAX_nf-far8-itb0ylrFgcQBB-3ZZ-0e6XvBjBx8VDx6mkw8wxMozM1TPQvuWa1FodDuCRKeUcngyQf41HzCybHMfuQ_0jRIBbLMcVTiwRIs
  Subtab 3 -- May 7, 2008
http://www.belmont.gov/SubContent.asp?CatId=240001788&C_ID=240002961
  Subtab 4 -- April 2, 2008
http://www.belmont.gov/SubContent.asp?CatId=240001788&C_ID=240002920
  Subtab 5 -- Mar 5, 2008
http://www.belmont.gov/SubContent.asp?CatId=240001788&C_ID=240002901
  Subtab 6 -- Feb 6, 2008
http://www.belmont.gov/SubContent.asp?CatId=240001788&C_ID=240002855
  Subtab 7 -- Dec 8, 2007
Not available yet
Click to add subtitle
http://www.belmont.gov/SubContent.asp?CatId=240001682&C_ID=240002830
  Subtab 8 -- Nov 2007
http://www.belmont.gov/SubContent.asp?CatId=240001682&C_ID=240002761
  Subtab 9 -- Oct 3, 2007
http://www.belmont.gov/SubContent.asp?CatId=240001682&C_ID=240002741
  Subtab 10 -- Sep 5, 2007
http://www.belmont.gov/SubContent.asp?CatId=240001682&C_ID=240002708
Tab 4 -- Current Belmont Parks
http://www.ci.belmont.ca.us/doc_center.asp?d_id=240002507
Tab 5 -- Coralin Feierbach information on Semeria Casa Bona Park
http://www.coralin.net/semeriapark.htm
Tab 6 -- San Mateo Daily Journal article on Semeria Park
http://www.smdailyjournal.com/article_preview.php?id=100274

Thank you for rating the Semeria Park binder.